Devis avec tableau de capacité
Send material photos, moisture and target tonnage. Within 12 working hours you get a model recommendation, a capacity table for your material and a price in your currency.
A machine is only half the purchase. The other half is commissioning, training and spare parts that arrive before the line stops. Here is exactly what we commit to.
Every order passes the same four stages. Nothing is outsourced to a trading company.
Send material photos, moisture and target tonnage. Within 12 working hours you get a model recommendation, a capacity table for your material and a price in your currency.
One engineer on site for 7-10 days: foundation check, alignment, trial run with your material, and operator training signed off by your shift leader.
Cutters, screens, bearings and hydraulic parts held in stock for 10 years after delivery. Wear parts ship within 48 hours of a confirmed order.
Remote login to the PLC for fault tracing, plus video walk-throughs for mechanical issues. Most stoppages are cleared without waiting for a visa.
| Request | First reply | Resolution | Channel |
|---|---|---|---|
| Price and capacity table | 12 h | 24 h | Email / WhatsApp |
| Technical question on a running machine | 4 h | 24 h | WhatsApp / video call |
| Spare part quotation | 12 h | 48 h dispatch | |
| On-site engineer (visa required) | 48 h plan | 7-15 days arrival |
The clock starts when your form lands in our inbox, not when a salesperson opens it. It runs only during working hours: Monday to Saturday, 08:30-18:00 China time. An enquiry sent at 21:00 on Friday gets its first reply by 10:30 on Saturday, not at 09:00 on Monday.
Every machine runs before it is crated. The signed sheet travels with the machine - ask for the one with your serial number and we send a scan.
| Check | Method | Pass criterion | Recorded |
|---|---|---|---|
| No-load run-in | 4 h at rated speed, both directions | Bearing temperature steady below 70 °C | Temperature log |
| Hydraulic pressure | Dead-head test at 1.25 x working pressure | No leak at joints, pressure holds 10 min | Gauge photo |
| Shaft alignment | Dial gauge on both shaft ends | Run-out within 0.05 mm | Reading sheet |
| Cutter gap | Feeler gauge, four points per shaft | Counter-knife gap within 0.3 mm of spec | Reading sheet |
| Electrical | Insulation resistance and phase sequence | Above 1 MΩ, rotation matches arrow | Test sheet |
| Interlocks | Open guard, trip emergency stop, cut power | Drive stops within 1 s, restart locked out | Checklist |
| Material trial | 200-500 kg of the customer's material where supplied | Output within the quoted size band | Sample photo |
| Paint and label | Visual, plus torque check on anchors | No bare steel, all plates legible | Photo set |
Third-party inspection (SGS, BV, TÜV) is welcome at your cost; we book the slot and prepare the machine for it.
These are the parts that stop a line. We hold stock for every model we have shipped, so you are not waiting on a production run.
| Part | Material | Life | Lead time |
|---|---|---|---|
| Cutter disc | Hardened alloy D2 | 800-1,500 h | 48 h |
| Screen mesh | Q235 / wear plate | 600-1,200 h | 48 h |
| Rotor bearing | SKF / NSK | 8,000 h | 72 h |
| Hydraulic pump | Rexroth type | 6,000 h | 7 days |
| PLC module | Siemens S7-1200 | - | 7 days |
Ninety percent of commissioning delays come from missing site information. Send these five items and the machine arrives ready to run.
Site layout drawing with the feed and discharge points marked.
Power supply: voltage, phase, frequency and available kVA.
Material sample or video, with moisture and bulk density.
Target output size and the buyer specification you must meet.
Operating hours per day and who will run the machine.
Local voltage protection and spare parts you already keep.
Photos, moisture and target tonnage are enough for a first recommendation.