SHUANGSHITONG — solid waste recycling equipment
Get a quote
Home/Service & support
After the purchase order

What happens after you place the order

A machine is only half the purchase. The other half is commissioning, training and spare parts that arrive before the line stops. Here is exactly what we commit to.

Four commitments

From enquiry to running line

Every order passes the same four stages. Nothing is outsourced to a trading company.

01

Quote with capacity table

Send material photos, moisture and target tonnage. Within 12 working hours you get a model recommendation, a capacity table for your material and a price in your currency.

Response 12 h
02

Installation & operator training

One engineer on site for 7-10 days: foundation check, alignment, trial run with your material, and operator training signed off by your shift leader.

On site 7-10 days
03

Spare parts supply

Cutters, screens, bearings and hydraulic parts held in stock for 10 years after delivery. Wear parts ship within 48 hours of a confirmed order.

Wear parts 48 h
04

PLC diagnostics & video support

Remote login to the PLC for fault tracing, plus video walk-throughs for mechanical issues. Most stoppages are cleared without waiting for a visa.

Reply within 4 h
Response times

What you can hold us to

Service level - working days, China time
RequestFirst replyResolutionChannel
Price and capacity table12 h24 hEmail / WhatsApp
Technical question on a running machine4 h24 hWhatsApp / video call
Spare part quotation12 h48 h dispatchEmail
On-site engineer (visa required)48 h plan7-15 days arrivalEmail
Our clock, right now
--:--
Zhengzhou · China Standard Time (UTC+8)
Checking office hours
What the 12-hour clock means

The clock starts when your form lands in our inbox, not when a salesperson opens it. It runs only during working hours: Monday to Saturday, 08:30-18:00 China time. An enquiry sent at 21:00 on Friday gets its first reply by 10:30 on Saturday, not at 09:00 on Monday.

Send now, first reply by --
  • Every reply carries a timestamp. Ask for the log of your own enquiry at any point and we send the thread.
  • If we miss the deadline, the next quotation goes out with the freight credit noted on it - no argument, no forms.
  • Existing customers with a stopped line skip the queue: WhatsApp messages are answered outside office hours.
Before it leaves

What we test, and what passes

Every machine runs before it is crated. The signed sheet travels with the machine - ask for the one with your serial number and we send a scan.

Pre-shipment inspection - standard scope
CheckMethodPass criterionRecorded
No-load run-in4 h at rated speed, both directionsBearing temperature steady below 70 °CTemperature log
Hydraulic pressureDead-head test at 1.25 x working pressureNo leak at joints, pressure holds 10 minGauge photo
Shaft alignmentDial gauge on both shaft endsRun-out within 0.05 mmReading sheet
Cutter gapFeeler gauge, four points per shaftCounter-knife gap within 0.3 mm of specReading sheet
ElectricalInsulation resistance and phase sequenceAbove 1 MΩ, rotation matches arrowTest sheet
InterlocksOpen guard, trip emergency stop, cut powerDrive stops within 1 s, restart locked outChecklist
Material trial200-500 kg of the customer's material where suppliedOutput within the quoted size bandSample photo
Paint and labelVisual, plus torque check on anchorsNo bare steel, all plates legiblePhoto set

Third-party inspection (SGS, BV, TÜV) is welcome at your cost; we book the slot and prepare the machine for it.

01Spare parts we keep on the shelf

These are the parts that stop a line. We hold stock for every model we have shipped, so you are not waiting on a production run.

Typical stock - consumables and critical parts
PartMaterialLifeLead time
Cutter discHardened alloy D2800-1,500 h48 h
Screen meshQ235 / wear plate600-1,200 h48 h
Rotor bearingSKF / NSK8,000 h72 h
Hydraulic pumpRexroth type6,000 h7 days
PLC moduleSiemens S7-1200-7 days

02What we need before shipping

Ninety percent of commissioning delays come from missing site information. Send these five items and the machine arrives ready to run.

01

Site layout drawing with the feed and discharge points marked.

02

Power supply: voltage, phase, frequency and available kVA.

03

Material sample or video, with moisture and bulk density.

04

Target output size and the buyer specification you must meet.

05

Operating hours per day and who will run the machine.

06

Local voltage protection and spare parts you already keep.

Ready when you are

Send your material, get a sized machine

Photos, moisture and target tonnage are enough for a first recommendation.

Get a quote